科技报告详细信息
TRA Closure Plan REV 0-9-20-06 HWMA/RCRA Closure Plan for the TRA/MTR Warm Waste System Voluntary Consent Order SITE-TANK-005 Tank System TRA-007
Winterholler, K.
Idaho National Laboratory - Idaho Cleanup Project
关键词: Hazardous Waste Management;   
DOI  :  10.2172/923811
RP-ID  :  DOE/ID-11284
RP-ID  :  DE-AC07-05ID14516
RP-ID  :  923811
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for portions of the Test Reactor Area/Materials Test Reactor Warm Waste System located in the Materials Test Reactor Building (TRA-603) at the Reactor Technology Complex, Idaho National Laboratory Site, to meet a further milestone established under Voluntary Consent Order Action Plan SITE-TANK-005 for Tank System TRA-007. The reactor drain tank and canal sump to be closed are included in the Test Reactor Area/Materials Test Reactor Warm Waste System. The reactor drain tank and the canal sump were characterized as having managed hazardous waste. The reactor drain tank and canal sump will be closed in accordance with the interim status requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265. This closure plan presents the closure performance standards and methods for achieving those standards.

【 预 览 】
附件列表
Files Size Format View
923811.pdf 1245KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:26次