HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan | |
Evans, S. K. | |
Idaho National Laboratory - Idaho Cleanup Project | |
关键词: Water Treatment Plants; Hazardous Materials Hazardous Waste Management; Ineel; Planning; Hazardous Waste Management; | |
DOI : 10.2172/924113 RP-ID : DOE/ID-11040 Rev. 4 RP-ID : DE-AC07-05ID14516 RP-ID : 924113 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
924113.pdf | 2776KB | download |