科技报告详细信息
Hydrologic Data and Evaluation for Model Validation Wells, MV-1, MV-2, and MV-3 near the Project Shoal Area
Lyles, B. ; Oberlander, P. ; Gillespie, D. ; Donithan, D. ; Chapman, J. ; Healey, J.
Nevada System of Higher Education. Desert Research Institute.
关键词: Radioactivity;    Lithium Bromides;    Iodine 129;    Bromides;    08 Hydrogen;   
DOI  :  10.2172/921628
RP-ID  :  DOE/NV/13609-50
RP-ID  :  AC52-00NV13609
RP-ID  :  921628
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

In 2006, a drilling campaign was conducted at the Project Shoal Area (PSA) to provide information for model validation, emplace long-term monitoring wells, and develop baseline geochemistry for long term hydrologic monitoring. Water levels were monitored in the vicinity of the drilling, in the existing wells HC-1 and HC-6, as well as in the newly drilled wells, MV-1, MV-2 and MV-3 and their associated piezometers. Periodic water level measurements were also made in existing wells HC-2, HC-3, HC-4, HC-5 and HC-7. A lithium bromide chemical tracer was added to drilling fluids during the installation of the monitoring and validation (MV) wells and piezometers. The zones of interest were the fractured, jointed and faulted horizons within a granitic body. These horizons generally have moderate hydraulic conductivities. As a result, the wells and their shallower piezometers required strenuous purging and development to remove introduced drilling fluids as evidenced by bromide concentrations. After airlift and surging well development procedures, the wells were pumped continuously until the bromide concentration was less then 1 milligram per liter (mg/L). Water quality samples were collected after the well development was completed. Tritium scans were preformed before other analyses to ensure the absence of high levels of radioactivity. Tritium levels were less than 2,000 pico-curies per liter. Samples were also analyzed for carbon-14 and iodine-129, stable isotopes of oxygen and hydrogen, as well as major cations and anions. Aquifer tests were performed in each MV well after the bromide concentration fell below acceptable levels. Water level data from the aquifer tests were used to compute aquifer hydraulic conductivity and transmissivity

【 预 览 】
附件列表
Files Size Format View
921628.pdf 2457KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:12次