Experimental Test Plan for Grouting H-3 Calcine | |
Herbst, Alan K. | |
Idaho Completion Project (ICP) | |
关键词: Waste Forms; Wastes Calcine; Vitrification; Maintenance; High-Level Waste; | |
DOI : 10.2172/911274 RP-ID : ICP/EXT-06-01166 RP-ID : DE-AC07-99ID-13727 RP-ID : 911274 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Approximately 4400 cubic meters of solid high-level waste called calcine are stored at the Idaho Nuclear Technology and Engineering Center. Under the Idaho Cleanup Project, dual disposal paths are being investigated. The first path includes calcine retrieval, package "as-is", and ship to the Monitored Geological Repository (MGR). The second path involves treatment of the calcine with such methods as vitrification or grouting. This test plan outlines the hot bench scale tests to grout actual calcine and verify that the waste form properties meet the waste acceptance criteria. This is a necessary sequential step in the process of qualifying a new waste form for repository acceptance. The archive H-3 calcine samples at the Contaminated Equipment Maintenance Building attached to New Waste Calcining Facility will be used in these tests at the Remote Analytical Laboratory. The tests are scheduled for the second quarter of fiscal year 2007.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
911274.pdf | 961KB | download |