科技报告详细信息
Cost Comparison for the Transfer of Select Calcined Waste Canisters to the Monitored Geologic Repository at Yucca Mountain, NV
Heiser, Michael B. ; Millet, Clark B.
Idaho Completion Project (ICP)
关键词: Yucca Mountain;    Storage;    Life-Cycle Cost;    Canisters;    Casks;   
DOI  :  10.2172/911218
RP-ID  :  ICP/EXT-05-00824
RP-ID  :  DE-AC07-99ID-13727
RP-ID  :  911218
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report performs a life-cycle cost comparison of three proposed canister designs for the shipment and disposition of Idaho National Laboratory high-level calcined waste currently in storage at the Idaho Nuclear Technology and Engineering Center to the proposed national monitored geologic repository at Yucca Mountain, Nevada. Concept A (2 × 10-ft) and Concept B (2 × 15-ft) canisters are comparable in design, but they differ in size and waste loading options and vary proportionally in weight. The Concept C (5.5 × 17.5-ft) canister (also called the “super canister”), while similar in design to the other canisters, is considerably larger and heavier than Concept A and B canisters and has a greater wall thickness. This report includes estimating the unique life-cycle costs for the three canister designs. Unique life-cycle costs include elements such as canister purchase and filling at the Idaho Nuclear Technology and Engineering Center, cask preparation and roundtrip consignment costs, final disposition in the monitored geologic repository (including canister off-loading and placement in the final waste disposal package for disposition), and cask purchase. Packaging of the calcine "as-is" would save $2.9 to $3.9 billion over direct vitrification disposal in the proposed national monitored geologic repository at Yucca Mountain, Nevada. Using the larger Concept C canisters would use 0.75 mi less of tunnel space, cost $1.3 billion less than 10-ft canisters of Concept A, and would be complete in 6.2 years.

【 预 览 】
附件列表
Files Size Format View
911218.pdf 370KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:34次