科技报告详细信息
2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
Shanklin, D.
Idaho National Laboratory - Idaho Closure Project
关键词: Inspection Operable Unit 3-13, Group 1 Tank Farm Interim Action;    Settling Ponds;    Radioactive Waste Storage;    Monitoring;    Ineel;   
DOI  :  10.2172/909860
RP-ID  :  DOE/ID-11275
RP-ID  :  DE-AC0705ID14516
RP-ID  :  909860
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.

【 预 览 】
附件列表
Files Size Format View
909860.pdf 1160KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:8次