2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action | |
Shanklin, D. | |
Idaho National Laboratory - Idaho Closure Project | |
关键词: Inspection Operable Unit 3-13, Group 1 Tank Farm Interim Action; Settling Ponds; Radioactive Waste Storage; Monitoring; Ineel; | |
DOI : 10.2172/909860 RP-ID : DOE/ID-11275 RP-ID : DE-AC0705ID14516 RP-ID : 909860 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
909860.pdf | 1160KB | download |