Advanced, Low/Zero Emission Boiler Design and Operation
Chatel-Pelage, Fabienne ; Varagani, Rajani
Air Liquide America L.P.
关键词: Heat Transfer;    Boilers;    Testing;    01 Coal, Lignite, And Peat;    Computerized Simulation;   
DOI  :  10.2172/898309
RP-ID  :  None
RP-ID  :  FC26-02NT41586
RP-ID  :  898309
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
This document reviews the work performed during the quarter April-June 2004. Task 1 (Site Preparation) had been completed 2003, along with three weeks of oxycombustion tests in Task 2 (experimental test performance) of the project. In current reporting period, the experimental testing has been completed: one additional week of tests has been performed to finalize the optimization of the combustion characteristics in O{sub 2}/CO{sub 2} environment ; two more days of testing were dedicated to mercury sampling in air-fired or O{sub 2}-fired conditions, and to characterization of heat transfer in O{sub 2} conditions vs. to air-blown conditions. Task 3 (Techno-Economic Study) has also been completed in current quarter: 250MWe, 500MWe and 1000MWe oxygen-fired PC unit have been simulated and quoted, and their performance and cost have been compared to same-capacity air-fired pulverized coal (PC) unit and IGCC. New and retrofit cases have been evaluated. The comparison has been completed in terms of capital cost, operating cost, cost of electricity and cost of CO{sub 2} avoided. The scope of task 4 (Conceptual Boiler Design) had been modified as per DOE request in previous quarter. Engineering calculations are currently in progress. Next steps include detail review of the experimental data collected during the entire testing campaign, finalization of detailed report on economic task, and reporting of the preliminary results in the boiler design task. Two papers summarizing the project main achievements have been presented at Clearwater coal conference in April 2004 (overall project results), and at the CO{sub 2} sequestration conference in May 2004 (emphasis on economics). Out of the {approx}$785k allocated DOE funds in this project, $545k have been spent to date, mainly in site preparation, test performance and economics assessment. In addition to DOE allocated funds, to date approximately $400k have been cost-shared by the participants, bringing the total project cost up to $945k as on June 30, 2004.
【 预 览 】
附件列表
Files Size Format View
898309.pdf 460KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:28次