科技报告详细信息
Final Report: Retrofit Aeration System (RAS) for Francis Turbine
Sullivan, Alan ; Bennett, DOE Project Officer Keith
AmerenUE
关键词: Testing;    Capacity;    Aeration;    Hydropower, Francis Turbine, Dissolved Oxygen, Retrofit Aeration System,;    Turbines;   
DOI  :  10.2172/891966
RP-ID  :  ID14408-01
RP-ID  :  FC36-02ID14408
RP-ID  :  891966
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Osage Plant and Bagnell Dam impounds the Osage River forming the Lake of the Ozarks in Missouri. Since it is nearly 100 feet deep, the lake stratifies during the summer months causing low DO water to be discharged into the Osage river below the dam. To supplement DO, the turbines are vented during the low DO season. AmerenUE is continually researching new methods of DO enhancement. New turbines, manufactured by American Hydro Corporation, were installed in Units 3 & 5 during the spring of 2002. Additional vent capacity and new nosecones were included in the new turbine design. The retrofit aeration system is an attempt to further enhance the DO in the tailrace by installation of additional venting capability on Unit 6 (not upgraded with new turbine) and refining design on special nosecones which will be mounted on both Unit 3 (upgraded turbine) and Unit 6. Baseline DO testing for Units 3 & 6 was conducted mid August, 2002. This data wascompared to further tests planned for the summer of 2003 and 2004 after installation of the retrofit aeration system.

【 预 览 】
附件列表
Files Size Format View
891966.pdf 1071KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:19次