科技报告详细信息
| Navajo Electrification Demonstraiton Project | |
| Larry Ahasteen, Project Manager | |
| Navajo Nation, Navajo Tribal Utility Authority (NTUA) | |
| 关键词: Demonstration Programs; 24 Power Transmission And Distribution; Electric Power; American Indians Navajo, Navajo Tribal Utility Authority, Tribal, Line Extensions, Electrificaiton; Navajo, Navajo Tribal Utility Authority, Tribal, Line Extensions, Electrificaiton; | |
| DOI : 10.2172/887047 RP-ID : none RP-ID : FG36-02GO12046 RP-ID : 887047 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 887047.pdf | 2836KB |
PDF