Emplacement Gantry Gap Analysis Study | |
Thornley, R. | |
United States. Department of Energy. Yucca Mountain Project Office. | |
关键词: License Applications; 43 Particle Accelerators; Personnel; Positioning; Yucca Mountain; | |
DOI : 10.2172/850425 RP-ID : 800-30R-HE00-00300-000-00 REV 00 RP-ID : AC28-01RW12101 RP-ID : 850425 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
To date, the project has established important to safety (ITS) performance requirements for structures, systems, and components (SSCs) based on the identification and categorization of event sequences that may result in a radiological release. These performance requirements are defined within the ''Nuclear Safety Design Bases for License Application'' (NSDB) (BSC 2005 [DIRS 171512], Table A-11). Further, SSCs credited with performing safety functions are classified as ITS. In turn, assurance that these SSCs will perform as required is sought through the use of consensus codes and standards. This gap analysis is based on the design completed for license application only. Accordingly, identification of ITS SSCs beyond those defined within the NSDB are based on designs that may be subject to further development during detail design. Furthermore, several design alternatives may still be under consideration to satisfy certain safety functions, and final selection will not be determined until further design development has occurred. Therefore, for completeness, alternative designs currently under consideration will be discussed throughout this study. This gap analysis will evaluate each code and standard identified within the ''Emplacement Gantry ITS Standards Identification Study'' (BSC 2005 [DIRS 173586]) to ensure each ITS performance requirement is fully satisfied. When a performance requirement is not fully satisfied, a gap is highlighted. This study will identify requirements to supplement or augment the code or standard to meet performance requirements. Further, this gap analysis will identify nonstandard areas of the design that will be subject to a design development plan. Nonstandard components and nonstandard design configurations are defined as areas of the design that do not follow standard industry practices or codes and standards. Whereby, assurance that an SSC will perform as required may not be readily sought though the use of consensus standards. This gap analysis is prepared by the Emplacement and Retrieval (E&R) project team and is intended for the sole use of the Engineering department in work regarding the emplacement gantry. Yucca Mountain Project personnel from the E&R project team should be consulted before use of this gap analysis for purposes other than those stated herein or by individuals other than authorized by the Engineering department.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
850425.pdf | 6988KB | download |