Busted Butte Phase II Excavation Analysis | |
Keifer, J.W. | |
United States. Department of Energy. Yucca Mountain Project Office. | |
关键词: Radioactive Waste Disposal; Strata Control; Excavation; Design; Underground Facilities; | |
DOI : 10.2172/850413 RP-ID : BABEE0000-01717-0200-00025 REV 00 RP-ID : NA RP-ID : 850413 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this analysis is to provide an engineering excavation and ground support design for the Busted Butte phase II mine back. The analysis will apply engineering practices and previous proven design methods for pillar design and ground support in accordance with applicable Integrated Safety Management principles and functions. The scope of this analysis is limited to the Busted Butte Test Facility. The intended use of this analysis is to provide testing excavation boundaries, ground support and pillar design input to drawing(s) to support test operations implementation. This design activity has been prepared under ''Technical Work Plan For Test Facilities Design FY01 Work Activities'' (TWP) (CRWMS M&O 2000b). No deviations from the TWP have been necessary for this analysis.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
850413.pdf | 2404KB | download |