科技报告详细信息
MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT | |
Sweeney, R.E. | |
United States. Department of Energy. Yucca Mountain Project Office. | |
关键词: Radioactive Waste Disposal; Radioactive Waste Facilities; Life-Cycle Cost; Cost Estimation; Design; | |
DOI : 10.2172/841250 RP-ID : MIS-MGR-AD-000002, REV 01 RP-ID : AC08-91RW00134 RP-ID : 841250 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
841250.pdf | 3180KB | download |