科技报告详细信息
EARLY ENTRANCE COPRODUCTION PLANT
Storm, David ; Nongbri, Govanon ; Decanio, Steve ; He, Ming ; Shah, Lalit ; Schrader, Charles ; Berry, Earl ; Ricci, Peter ; Demirel, Belma ; Benham, Charles ; Bohn, Mark
Texaco Energy Systems LLC (United States)
关键词: Financing;    02 Petroleum;    Petroleum Products;    Testing;    01 Coal, Lignite, And Peat;   
DOI  :  10.2172/823504
RP-ID  :  NONE
RP-ID  :  FC26-99FT40658
RP-ID  :  823504
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.

【 预 览 】
附件列表
Files Size Format View
823504.pdf 821KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:18次