科技报告详细信息
EARLY ENTRANCE COPRODUCTION PLANT
Abughazaleh, John S. ; Ahmed, Mushtaq ; Anand, Ashok ; Anderson, John H. ; Benham, Charles ; Brent, Fred D. ; Chance, Thomas E. ; Davis, William K. ; Drnevich, Raymond F. ; Hall, Larry ; He, Ming ; Lang, Stephen A. ; Mintner, David ; Moore, Wendy ; Ong, Jimmy O. ; Potoczniak, George ; Sanchez, Adela G. ; Schrader, Charles H. ; Shah, Lalit S. ; Sheth, Kalapi D. ; Shires, Phil J. ; Song, Rae
National Energy Technology Laboratory (U.S.)
关键词: Financing;    02 Petroleum;    Petroleum Products;    01 Coal, Lignite, And Peat;    Coke;   
DOI  :  10.2172/788764
RP-ID  :  FC26-99FT40658--14
RP-ID  :  FC26-99FT40658
RP-ID  :  788764
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The overall objective of this project is the three-phase development of an Early Entrance Coproduction Plant (EECP) that produces at least one product from at least two of the following three categories: Electric power (or heat); Fuels; and Chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or some other carbonaceous feedstock, such as petroleum coke. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing (RD and T) Plan for implementation in Phase II. This objective has now been accomplished. A specific site, Motiva Refinery in Port Arthur, Texas, has been selected as the location best suited for the EECP. The accomplishments of Phase I are discussed in detail in this Phase I Concept Report. A RD and T Plan and a preliminary project financing plan have been developed and are submitted separately from this report.

【 预 览 】
附件列表
Files Size Format View
788764.pdf 718KB PDF download
  文献评价指标  
  下载次数:27次 浏览次数:24次