科技报告详细信息
CH Packaging Operations for High Wattage Waste at LANL | |
Westinghouse TRU Solutions LLC | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Manuals; Leak Testing Doe; 12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities; O-Ring; Tdop; | |
DOI : 10.2172/815197 RP-ID : DOE/WIPP 02-3220, rev. 4 RP-ID : 04-01AL66444 RP-ID : 815197 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
815197.pdf | 684KB | download |