CH Packaging Operations for High Wattage Waste at LANL
Westinghouse TRU Solutions LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Manuals;    Leak Testing Doe;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;    O-Ring;    Tdop;   
DOI  :  10.2172/815197
RP-ID  :  DOE/WIPP 02-3220, rev. 4
RP-ID  :  04-01AL66444
RP-ID  :  815197
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.

【 预 览 】
附件列表
Files Size Format View
815197.pdf 684KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:10次