科技报告详细信息
| CH Packaging Operations for High Wattage Waste at LANL | |
| Westinghouse TRU Solutions LLC | |
| Waste Isolation Pilot Plant (N.M.) | |
| 关键词: Alpha-Bearing Wastes; Manuals; Gaskets; Lanl; Seals; | |
| DOI : 10.2172/815193 RP-ID : DOE/WIPP 02-3220, Rev. 1 RP-ID : 04-01A66444 RP-ID : 815193 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 815193.pdf | 695KB |
PDF