科技报告详细信息
CH Packaging Operations for High Wattage Waste at LANL
Westinghouse TRU Solutions LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Tdop;    Ch;    Alpha-Bearing Wastes;    Manuals;    Payload Assembly;   
DOI  :  10.2172/815191
RP-ID  :  DOE/WIPP 02-3220, Rev. 0
RP-ID  :  04-01AL66444
RP-ID  :  815191
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.

【 预 览 】
附件列表
Files Size Format View
815191.pdf 640KB PDF download
  文献评价指标  
  下载次数:20次 浏览次数:17次