CALLA ENERGY BIOMASS COFIRING PROJECT
Gas Technology Institute
关键词: Biomass;    Gasification;    Carbon Monoxide;    01 Coal, Lignite, And Peat;    Fuel Gas;   
DOI  :  10.2172/811415
RP-ID  :  NONE
RP-ID  :  FC26-00NT40899
RP-ID  :  811415
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts focused on completion of the Topical Report, summarizing the design and techno-economic study of the project's feasibility. GTI received supplemental authorization A002 from DOE contracts for additional work to be performed under Phase I that will further extend the performance period until the end of February 2003. The additional scope of work is for GTI to develop the gasification characteristics of selected feedstock for the project. To conduct this work, GTI will assemble an existing ''mini-bench'' unit to perform the gasification tests. The results of the test will be used to confirm or if necessary update the process design completed in Phase Task 1.

【 预 览 】
附件列表
Files Size Format View
811415.pdf 157KB PDF download
  文献评价指标  
  下载次数:60次 浏览次数:54次