Yucca Mountain Project Subsurface Facilities Design
Linden, A. ; Saunders, R.S. ; Boutin, R.J. ; Harrington, P.G. ; Lachman, K.D. ; Trautner, L.J.
United States. Department of Energy. Yucca Mountain Project Office.
关键词: Recommendations;    Positioning;    Yucca Mountain;    Site Characterization;    Wastes;   
DOI  :  10.2172/808020
RP-ID  :  NONE
RP-ID  :  NONE
RP-ID  :  808020
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Four units of the Topopah Springs formation (volcanic tuff) are considered for the proposed repository: the upper lithophysal, the middle non-lithophysal, the lower lithophysal, and the lower non-lithophysal. Yucca Mountain was recently designated the site for a proposed repository to dispose of spent nuclear fuel and high-level radioactive waste. Work is proceeding to advance the design of subsurface facilities to accommodate emplacing waste packages in the proposed repository. This paper summarized recent progress in the design of subsurface layout of the proposed repository. The original Site Recommendation (SR) concept for the subsurface design located the repository largely within the lower lithophysal zone (approximately 73%) of the Topopah The Site Recommendation characterized area suitable for emplacement consisted of the primary upper block, the lower block and the southern upper block extension. The primary upper block accommodated the mandated 70,000 metric tons of heavy metal (MTHM) at a 1.45 kW/m hear heat load. Based on further study of the Site Recommendation concept, the proposed repository siting area footprint was modified to make maximum use of available site characterization data, and thus, reduce uncertainties associated with performance assessment. As a result of this study, a modified repository footprint has been proposed and is presently being review for acceptance by the DOE. A panel design concept was developed to reduce overall costs and reduce the overall emplacement schedule. This concept provides flexibility to adjust the proposed repository subsurface layout with time, as it makes it unnecessary to ''commit'' to development of a large single panel at the earliest stages of construction. A description of the underground layout configuration and influencing factors that affect the layout configuration are discussed in the report.

【 预 览 】
附件列表
Files Size Format View
808020.pdf 941KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:21次