科技报告详细信息
Office of River Protection (RPP) Interface Management in the Multi Contract Project Environment at Hanford
SHIKASHIO, L.A.
CH2M Hill Hanford Group, Inc.
关键词: Commissioning;    Charges;    Radioactive Waste Management;    Remedial Action;    Storage Facilities;   
DOI  :  10.2172/804744
RP-ID  :  CHG-7104-FP, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  804744
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces.

【 预 览 】
附件列表
Files Size Format View
804744.pdf 361KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:27次