科技报告详细信息
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V | |
Koch, M. R. | |
CH2M Hill Hanford Group, Inc. | |
关键词: Radioactive Waste Storage; Computerized Control Systems; Performance Testing; Storage Facilities; 12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities; | |
DOI : 10.2172/803668 RP-ID : RPP-6201, Rev.0 RP-ID : AC27-99RL14047 RP-ID : 803668 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
803668.pdf | 1359KB | download |