科技报告详细信息
| Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N | |
| Koch, M. R. | |
| CH2M Hill Hanford Group, Inc. | |
| 关键词: Pumping; Radioactive Waste Storage; Storage Facilities; Computerized Control Systems; Performance Testing; | |
| DOI : 10.2172/801338 RP-ID : RPP-5490, Rev.0 RP-ID : AC27-99RL14047 RP-ID : 801338 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 801338.pdf | 1700KB |
PDF