科技报告详细信息
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N
Koch, M. R.
CH2M Hill Hanford Group, Inc.
关键词: Pumping;    Radioactive Waste Storage;    Storage Facilities;    Computerized Control Systems;    Performance Testing;   
DOI  :  10.2172/801338
RP-ID  :  RPP-5490, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  801338
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

【 预 览 】
附件列表
Files Size Format View
801338.pdf 1700KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:14次