科技报告详细信息
Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid
Koch, M. R.
CH2M Hill Hanford Group, Inc.
关键词: Pumping;    Waste Retrieval;    Storage Facilities;    Computerized Control Systems;    Performance Testing;   
DOI  :  10.2172/801327
RP-ID  :  HNF-5820, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  801327
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).

【 预 览 】
附件列表
Files Size Format View
801327.pdf 6243KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:13次