科技报告详细信息
Operational Test Report (OTR) for U-102 Pumping and Instrumentation and Control (PIC) Skid | |
Koch, M. R. | |
CH2M Hill Hanford Group, Inc. | |
关键词: Pumping; Waste Retrieval; Storage Facilities; Computerized Control Systems; Performance Testing; | |
DOI : 10.2172/801326 RP-ID : HNF-5819, Rev.0 RP-ID : AC06-96RL13200 RP-ID : 801326 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-19 and Rev. A-20). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-102. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
801326.pdf | 10431KB | download |