科技报告详细信息
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T
Koch, M. R.
CH2M Hill Hanford Group, Inc.
关键词: Radioactive Waste Storage;    Computerized Control Systems;    Performance Testing;    Storage Facilities;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;   
DOI  :  10.2172/803667
RP-ID  :  RPP-6197, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  803667
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

【 预 览 】
附件列表
Files Size Format View
803667.pdf 1365KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:17次