科技报告详细信息
Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment
Pitner, A. L.
Fluor Hanford, Inc.
关键词: Materials Handling Equipment;    Sludges;    Fuel Storage Pools;    Scrap Metals;    Performance Testing;   
DOI  :  10.2172/803041
RP-ID  :  SNF-6109, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  803041
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled.
【 预 览 】
附件列表
Files Size Format View
803041.pdf 415KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:17次