科技报告详细信息
CMIR/PCR/FRR for Closure of SRL Seepage Basins Operable Unit (904-53G1, -53G2, -54G, and -55G) | |
Sappington, F. C. | |
Savannah River Site (S.C.) | |
关键词: Settling Ponds; Documentation; Remedial Action; 11 Nuclear Fuel Cycle And Fuel Materials; Savannah River Plant; | |
DOI : 10.2172/799473 RP-ID : WSRC-RP-2001-4123, Rev. 1, Final RP-ID : AC09-96SR18500 RP-ID : 799473 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this Corrective Measures Implementation Report/Post-Construction Report/Final Remediation Report (CMIR/PCR/FRR) is to document compliance with technical and statutory requirements and to provide a consolidated record of all removal and remedial activities that have taken place during implementation of the selected corrective measure/remedial action for the Savannah River Laboratory Seepage Basins (SRLSBs) at the Savannah River Site (SRS).
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
799473.pdf | 4389KB | download |