科技报告详细信息
| Unit-Specific Amended Plug-In Proposed Plan for the C-Area Reactor Seepage Basin (904-67G) and L-Area Reactor Seepage Basin (904-64G) | |
| Eisenstat, P. | |
| Savannah River Site (S.C.) | |
| 关键词: Settling Ponds; Radioactive Waste Facilities; Remedial Action; L Reactor; 11 Nuclear Fuel Cycle And Fuel Materials; | |
| DOI : 10.2172/799395 RP-ID : WSRC-RP-2001-4255, Rev. 1, Final RP-ID : AC09-96SR18500 RP-ID : 799395 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This document provides the technical information needed to demonstrate that these operable units (OUs) met the requirements for using the Plug-in ROD to specify the remediation for these OUs.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 799395.pdf | 30139KB |
PDF