科技报告详细信息
EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS
National Energy Technology Laboratory (U.S.)
关键词: Coal Gasification;    Culm;    02 Petroleum;    Petroleum Products;    Power Generation;   
DOI  :  10.2172/795257
RP-ID  :  FC26-00NT40693--03
RP-ID  :  FC26-00NT40693
RP-ID  :  795257
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Waste Processors Management, Inc. (WMPI), along with its subcontractors Texaco Power & Gasification, SASOL Technology Ltd., and Nexant Inc. entered into a Cooperative Agreement DE-FC26-00NT40693 with the US Department of Energy (DOE), National Energy Technology Laboratory (NETL) to assess the techno-economic viability of building an Early Entrance Co-Production Plant (EECP) in the US to produce ultra clean Fischer-Tropsch (FT) transportation fuels with either power or steam as the major co-product. The EECP designs emphasize on recovery and gasification of low-cost coal waste (culm) from coal clean operations and will assess blends of the culm and coal or petroleum coke as feedstocks. The project is being carried out in three phases. Phase I involves definition of concept and engineering feasibility study to identify areas of technical, environmental and financial risk. Phase II consists of an experimental testing program designed to validate the coal waste mixture gasification performance. Phase III involves updating the original EECP design, based on results from Phase II, to prepare a preliminary engineering design package and financial plan for obtaining private funding to build a 5,000 BPD coal gasification/liquefaction plant next to an existing co-generation plant in Gilberton, Schuylkill County, Pennsylvania.

【 预 览 】
附件列表
Files Size Format View
795257.pdf 7648KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:9次