科技报告详细信息
Early Entrance Co-Production Plant - Decentralized Gasification Cogeneration Transportation Fuels and Steam From Available Feedstocks, Quarterly Report: October - December 2001
Rich, John W.
Waste Management & Processors, Inc.
关键词: Culm;    Contractors;    02 Petroleum;    Petroleum Products;    01 Coal, Lignite, And Peat;   
DOI  :  10.2172/835241
RP-ID  :  NONE
RP-ID  :  FC26-00NT40693
RP-ID  :  835241
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Waste Processors Management, Inc. (WMPI), along with its subcontractors Texaco Power and Gasification (now ChevronTexaco), SASOL Technology Ltd., and Nexant Inc. entered into a Cooperative Agreement with the USDOE, National Energy Technology Laboratory (NETL) to assess the techno-economic viability of building an Early Entrance Co-Production Plant (EECP) in the US to produce ultra clean Fischer-Tropsch (FT) transportation fuels with either power or steam as the major co--product. The EECP design includes recovery and gasification of low-cost coal waste (culm) from physical coal cleaning operations and will assess blends of the culm with coal or petroleum coke. The project has three phases: Phase 1 is the concept definition and engineering feasibility study to identify areas of technical, environmental and financial risk. Phase 2 is an experimental testing program designed to validate the coal waste mixture gasification performance. Phase 3 updates the original EECP design based on results from Phase 2, to prepare a preliminary engineering design package and financial plan for obtaining private funding to build a 5,000 barrel per day (BPD) coal gasification/liquefaction plant next to an existing co-generation plant in Gilberton, Schuylkill County, Pennsylvania. The current report is WMPI's third quarterly technical progress report. It covers the period performance from October 1, 2001 through December 31, 2001.

【 预 览 】
附件列表
Files Size Format View
835241.pdf 1374KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:14次