科技报告详细信息
Defense Acquisitions: Despite Restructuring, SBIRS High Program Remains at Risk of Cost and Schedule Overruns
United States. General Accounting Office.
United States. General Accounting Office.
关键词: Government accountability -- United States.;    government operations;    national defense;    defense acquisitions;    letter report;   
RP-ID  :  GAO-04-48
RP-ID  :  240501
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

A letter report issued by the General Accounting Office with an abstract that begins "In 1996, the Department of Defense (DOD) initiated the Space-Based Infrared System (SBIRS) to provide greater long-range ballistic missile detection capabilities than its current system. The initial SBIRS architecture included "High" and "Low" orbiting space-based components and ground processing segments. SBIRS has been technically challenging, and in October 2001, SBIRS Low was transferred from the Air Force to the Missile Defense Agency. The Air Force expected to field SBIRS High by 2004, but numerous problems have led to schedule overruns. In the fall of 2001, DOD identified potential cost growth of $2 billion. To determine the causes of the significant cost growth, DOD convened an Independent Review Team. In August 2002, the Air Force restructured the program to address the findings of the team's assessment. Our report (1) describes the key elements of the restructured program and (2) identifies problems and potential risks still facing the program."

【 预 览 】
附件列表
Files Size Format View
240501.pdf 808KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:9次