科技报告详细信息
2004 Fermilab fall shutdown p-bar water issues
Dyer, Albert ; Schneider, Frank ; /Fermilab
Fermi National Accelerator Laboratory
关键词: 43 Particle Accelerators;    Water Accelerators;    Shutdown;    Accelerators;    Accelerators;   
DOI  :  10.2172/15017020
RP-ID  :  FERMILAB-TM-2281-AD
RP-ID  :  AC02-76CH03000
RP-ID  :  15017020
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

I was assigned to Frank Schneider, who works within the Accelerator Division Water Group. Frank would educate me with issues pertaining to water flow cooling at the P-Bar facility. Also during the shutdown period, water issues in the Pre-Vault Stub Room would be addressed.

【 预 览 】
附件列表
Files Size Format View
15017020.pdf 114KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:21次