National NIF Diagnostic Program Interim Management Plan | |
Warner, B | |
Lawrence Livermore National Laboratory | |
关键词: Management; Program Management; 70 Plasma Physics And Fusion Technology; Monitors; Functionals; | |
DOI : 10.2172/15013371 RP-ID : UCRL-ID-148060 RP-ID : W-7405-ENG-48 RP-ID : 15013371 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NNDP Interim Management Plan. A Draft Program Execution Plan (PEP) for the National NIF Diagnostics Program has been also been prepared (NIF-0072083, Oct 2001, attached as Attachment 1) that describes the NNDP technical, cost, and schedule baselines, the method by which the NNDP will fund and monitor the work to be done by the participating laboratories; the process for controlling changes; and the associated reporting and review process. This plan is expected to be approved by the relevant stakeholders at the appropriate time; however, since October 2001, the NNDP has been operating according to the processes laid out in the draft PEP. Below is a summary of the most important aspects of the NNDP that are being applied during this interim period before approval of the full PEP.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
15013371.pdf | 1149KB | download |