科技报告详细信息
Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson
Barr, Jonathan L. ; Tuffner, Francis K. ; Hadley, Mark D. ; Kreyling, Sean J. ; Schneider, Kevin P.
Pacific Northwest National Laboratory (U.S.)
关键词: Dod;    Energy;    Microgrid;    Spiders;    Cyber-Security;   
DOI  :  10.2172/1115837
RP-ID  :  PNNL-22733
RP-ID  :  AC05-76RL01830
RP-ID  :  1115837
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

【 预 览 】
附件列表
Files Size Format View
1115837.pdf 1059KB PDF download
  文献评价指标  
  下载次数:45次 浏览次数:66次