科技报告详细信息
Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Chicago, Milwaukee, and St. Paul Rail Yard Company Site in Perry, Iowa.
Salasovich, J. ; Geiger, J. ; Healey, V. ; Mosey, G.
National Renewable Energy Laboratory (U.S.)
关键词: Perry;    32 Energy Conservation, Consumption, And Utilization Epa;    Former Chicago, Milwaukee &;    St. Paul Rail Yard Company;    14 Solar Energy;   
DOI  :  10.2172/1071973
RP-ID  :  NREL/TP-7A40-56793
RP-ID  :  AC36-08GO28308
RP-ID  :  1071973
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

【 预 览 】
附件列表
Files Size Format View
1071973.pdf 1863KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:12次