科技报告详细信息
Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel.
Roberts, J. O. ; Mosey, G.
National Renewable Energy Laboratory (U.S.)
关键词: 32 Energy Conservation, Consumption, And Utilization Epa;    Heat Pump;    Economics;    Pennsylvania;    Energy Analysis;   
DOI  :  10.2172/1068622
RP-ID  :  NREL/TP-6A20-51321
RP-ID  :  AC36-08GO28308
RP-ID  :  1068622
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

【 预 览 】
附件列表
Files Size Format View
1068622.pdf 6218KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:33次