科技报告详细信息
Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites
Moriarty, K.
National Renewable Energy Laboratory (U.S.)
关键词: Bioenergy;    Biomass;    Biopower;    Rps;    Superfund;   
DOI  :  10.2172/1064534
RP-ID  :  NREL/TP-7A30-57610
RP-ID  :  AC36-08GO28308
RP-ID  :  1064534
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

【 预 览 】
附件列表
Files Size Format View
1064534.pdf 3007KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:28次