科技报告详细信息
Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites | |
Moriarty, K. | |
National Renewable Energy Laboratory (U.S.) | |
关键词: Bioenergy; Biomass; Biopower; Rps; Superfund; | |
DOI : 10.2172/1064534 RP-ID : NREL/TP-7A30-57610 RP-ID : AC36-08GO28308 RP-ID : 1064534 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1064534.pdf | 3007KB | download |