科技报告详细信息
Sampling Point Compliance Tests for 325 Building at Set-Back Flow Conditions
Ballinger, Marcel Y. ; Glissmeyer, John A. ; Barnett, J. M. ; Recknagle, Kurtis P. ; Yokuda, Satoru T.
Pacific Northwest National Laboratory (U.S.)
关键词: Blowers;    Processing;    Radioactive Materials;    Regulations;    Ducts;   
DOI  :  10.2172/1015905
RP-ID  :  PNNL-20397
RP-ID  :  AC05-76RL01830
RP-ID  :  1015905
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The stack sampling system at the 325 Building (Radiochemical Processing Laboratory [RPL]) was constructed to comply with the American National Standards Institute’s (ANSI’s) Guide to Sampling Airborne Radioactive Materials in Nuclear Facilities (ANSI N13.1-1969). This standard provided prescriptive criteria for the location of radionuclide air-sampling systems. In 1999, the standard was revised (Sampling and Monitoring Releases of Airborne Radioactive Substances From the Stacks and Ducts of Nuclear Facilities [ANSI/Health Physics Society [HPS] 13.1-1999]) to provide performance-based criteria for the location of sampling systems. Testing was conducted for the 325 Building stack to determine whether the sampling system would meet the updated criteria for uniform air velocity and contaminant concentration in the revised ANSI/HPS 13.1-1999 standard under normal operating conditions (Smith et al. 2010). Measurement results were within criteria for all tests. Additional testing and modeling was performed to determine whether the sampling system would meet criteria under set-back flow conditions. This included measurements taken from a scale model with one-third of the exhaust flow and computer modeling of the system with two-thirds of the exhaust flow. This report documents the results of the set-back flow condition measurements and modeling. Tests performed included flow angularity, uniformity of velocity, gas concentration, and particle concentration across the duct at the sampling location. Results are within ANSI/HPS 13.1-1999 criteria for all tests. These tests are applicable for the 325 Building stack under set-back exhaust flow operating conditions (980 - 45,400 cubic feet per minute [cfm]) with one fan running. The modeling results show that criteria are met for all tests using a two-fan configuration exhaust (flow modeled at 104,000 cfm). Combined with the results from the earlier normal operating conditions, the ANSI/HPS 13.1-1999 criteria for all tests are met for all configurations: one, two, or three fans (normal).

【 预 览 】
附件列表
Files Size Format View
1015905.pdf 2984KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:20次