Assessment of the Group 5-6 (LB C2, LB S2, LV S1) Stack Sampling Probe Locations for Compliance with ANSI/HPS N13.1 1999 | |
Glissmeyer, John A. ; Flaherty, Julia E. ; Piepel, Gregory F. | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Testing; Monitoring; Disturbances; Ducts; Air; | |
DOI : 10.2172/1011809 RP-ID : PNNL-20154 RP-ID : AC05-76RL01830 RP-ID : 1011809 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This document reports on a series of tests to assess the proposed air sampling locations for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Group 5-6 exhaust stacks with respect to the applicable criteria regarding the placement of an air sampling probe. The LB-C2, LV-S1, and LB S2 exhaust stacks were tested together as a group (Test Group 5-6) because the common factor in their design is that the last significant flow disturbance upstream of the air sampling probe is a reduction in duct diameter. Federal regulations( ) require that a sampling probe be located in the exhaust stack according to the criteria of the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The testing on scale models of the stacks conducted for this project was part of the River Protection Project—Waste Treatment Plant Support Program under Contract No. DE-AC05-76RL01830 according to the statement of work issued by Bechtel National Inc. (BNI, 24590-QL-SRA-W000-00101, N13.1-1999 Stack Monitor Scale Model Testing and Qualification, Revision 1, 9/12/2007) and Work Authorization 09 of Memorandum of Agreement 24590-QL-HC9-WA49-00001. The internal Pacific Northwest National Laboratory (PNNL) project for this task is 53024, Work for Hanford Contractors Stack Monitoring. The testing described in this document was further guided by the Test Plan Scale Model Testing the Waste Treatment Plant LB-C2, LB-S2, and LV-S1 (Test Group 5-6) Stack Air Sampling Positions (TP-RPP-WTP-594). The tests conducted by PNNL during 2009 and 2010 on the Group 5-6 scale model systems are described in this report. The series of tests consists of various measurements taken over a grid of points in the duct cross-section at the designed sampling probe locations and at five duct diameters up and downstream from the design location to accommodate potential construction variability. The tests were done only at the design sampling probe location on the scale model of LB-S2 because that ductwork was already constructed. The ANSI/HPS N13.1-1999 criteria and the corresponding results of the test series on the scale models are summarized in this report.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
1011809.pdf | 5943KB | download |