科技报告详细信息
TRA Closure Plan REV 0-9-20-06 HWMA/RCRA Closure Plan for the TRA/MTR Warm Waste System Voluntary Consent Order SITE-TANK-005 Tank System TRA-007
Winterholler, K.
关键词: ADMINISTRATIVE PROCEDURES;    CLOSURES;    ORDERS;    PERFORMANCE;    REACTOR TECHNOLOGY;    REGULATIONS;    TANKS;    TEST REACTORS;    WASTE MANAGEMENT;    WASTES Hazardous Waste Management;   
DOI  :  10.2172/923812
RP-ID  :  DOE/ID-11284
PID  :  OSTI ID: 923812
Others  :  TRN: US0802966
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for portions of the Test Reactor Area/Materials Test Reactor Warm Waste System located in the Materials Test Reactor Building (TRA-603) at the Reactor Technology Complex, Idaho National Laboratory Site, to meet a further milestone established under Voluntary Consent Order Action Plan SITE-TANK-005 for Tank System TRA-007. The reactor drain tank and canal sump to be closed are included in the Test Reactor Area/Materials Test Reactor Warm Waste System. The reactor drain tank and the canal sump were characterized as having managed hazardous waste. The reactor drain tank and canal sump will be closed in accordance with the interim status requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265. This closure plan presents the closure performance standards and methods for achieving those standards.

【 预 览 】
附件列表
Files Size Format View
RO201705190002886LZ 1245KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:32次