科技报告详细信息
Entry Boreholes Summary Report for the Waste Treatment Plant Seismic Boreholes Project
Horner, Jake A.
关键词: BASALT;    BOREHOLES;    DESIGN;    WASTE PROCESSING;   
DOI  :  10.2172/912732
RP-ID  :  PNNL-16417
PID  :  OSTI ID: 912732
Others  :  Other: 830403000
Others  :  TRN: US200801%%1167
学科分类:地球科学(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report describes the 2006 fiscal year field activities associated with the installation of four cable-tool-drilled boreholes located within the boundary of the Waste Treatment Plant (WTP), DOE Hanford site, Washington. The cable-tool-drilled boreholes extend from surface to ~20 ft below the top of basalt and were utilized as cased entry holes for three deep boreholes (approximately 1400 ft) that were drilled to support the acquisition of sub-surface geophysical data, and one deep corehole (1400 ft) that was drilled to acquire continuous core samples from underlying basalt and sedimentary interbeds. The geophysical data acquired from these boreholes will be integrated into a seismic response model that will provide the basis for defining the seismic design criteria for the WTP facilities.

【 预 览 】
附件列表
Files Size Format View
RO201705190002627LZ 13412KB PDF download
  文献评价指标  
  下载次数:25次 浏览次数:15次