科技报告详细信息
Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.
Brouns, Thomas M.
关键词: BASALT;    BOREHOLES;    DRILLING;    MOUNTAINS;    QUALITY ASSURANCE;    SAMPLING;    SEDIMENTS;    TESTING;    US CORPS OF ENGINEERS;    WASTE PROCESSING;   
DOI  :  10.2172/929208
RP-ID  :  PNNL-15848 Revision 3
PID  :  OSTI ID: 929208
Others  :  Other: 830403000
Others  :  TRN: US200814%%95
学科分类:地球科学(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

【 预 览 】
附件列表
Files Size Format View
RO201705190001440LZ 380KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:13次