FINAL ANALYTICAL RESULTS FROM THE EXAMINATION OF CORROSION ON SECTIONS OF CORROSION PROBE REMOVED FROM TANK 241-AN-107 ON 08/10/2006 | |
DUNCAN JB ; COOKE GA | |
关键词: AR FACILITIES; CREVICE CORROSION; PITTING CORROSION; STORAGE FACILITIES; CORROSION PRODUCTS; EVALUATION; RADIOACTIVE WASTE STORAGE; | |
DOI : 10.2172/940013 RP-ID : RPP-RPT-32425 Rev 0 PID : OSTI ID: 940013 Others : TRN: US0807069 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
Tank Farms Operations removed an electrochemical noise probe from Tank 241-AN-107. In the field, the probe was cut into four sections, wrapped, and placed in a 55-gallon drum, This drum was delivered to the 222-S Laboratory. The 222 S Laboratory unpackaged the sections of the AN-107 electrochemical noise probe and examined the material for evidence of corrosion. Each of the four sections contained three C-ring and three bullet specimens. The specimens were examined for pitting corrosion, crevice corrosion, and stress corrosion cracking. No evidence of stress corrosion cracking was found in the stressed C-ring specimens. Minor pitting was evident on some surfaces. Crevice corrosion was the dominant type of corrosion observed.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201705190002407LZ | 7749KB | download |