Final Report - Navajo Electrification Demonstration Project - FY2004 | |
Kenneth L. Craig, Interim General Manager | |
关键词: AMERICAN INDIANS; DEMONSTRATION PROGRAMS; POWER TRANSMISSION LINES; INSTALLATION Navajo; NEDP; Electrification; Line Extension; | |
DOI : 10.2172/947555 RP-ID : DOE/CH/11240 PID : OSTI ID: 947555 Others : TRN: US201006%%799 |
|
学科分类:电力 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.