科技报告详细信息
Fort Peck Reservations Wind Project
Walter White Tail Feather
关键词: BUSINESS;    MAINTENANCE;    MANAGEMENT;    SALES;    TURBINES;    WIND TURBINES Assiniboine and sioux Tribes;    Fort Peck Reservation;    tribal;    wind;    wind turbines;   
DOI  :  10.2172/915088
RP-ID  :  None
PID  :  OSTI ID: 915088
Others  :  TRN: US200821%%339
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The research area adds to the understanding of the area investigated by installing two 50kW Wind Turbines in a distributed generation project to save money by reducing the annual bill from the local utility. These turbines have been producing power and reducing the kWh consumed at the Tribal Headquarters Building for approximately 11 months. The Turbines are almost one year old and the Tribe is conducting regular maintenance checks and inspections to keep the Turbines in good working order. These Turbines are the impetus for the development of an Energy Department to serve as the focal point for wind development on the Reservation and to provide management for the business side of wind energy, (i.e. green tag sales, O & M contracts, and Power Purchase Agreements).
【 预 览 】
附件列表
Files Size Format View
RO201705190001188LZ 574KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:22次