科技报告详细信息
Summary of Bounding Requirements for the NGNP Demonstration Plant F&ORs
Not Listed
关键词: CONFIGURATION;    DEMONSTRATION PLANTS;    DESIGN;    FUNCTIONALS;    SPECIFICATIONS Bounding Requirements;    Demonstration Plant;    F&ORs;    NGNP;   
DOI  :  10.2172/934548
RP-ID  :  INL/EXT-08-14395
PID  :  OSTI ID: 934548
Others  :  TRN: US0803874
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report documents bounding functional and operating requirements (F&ORs)for the Next Generation Nuclear Plant (NGNP) Project to support selection of the nuclear system design and specification of the operating conditions and configuration of NGNP once the nuclear system design is selected. These requirements supplement the detailed F&ORs for NGNP developed in the FY07 NGNP Pre-conceptual design work.

【 预 览 】
附件列表
Files Size Format View
RO201705180001818LZ 695KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:26次