科技报告详细信息
Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio
P.C. Weaver
关键词: CLOSURES;    CONTRACTORS;    REMEDIAL ACTION;    REMOVAL;    SOILS;    VERIFICATION Independent Verification Survey Miamisburg Closure Project;   
DOI  :  10.2172/959379
RP-ID  :  ORISE 0486-SR-01-0
PID  :  OSTI ID: 959379
Others  :  TRN: US0904400
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

【 预 览 】
附件列表
Files Size Format View
RO201705180001284LZ 5039KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:22次