科技报告详细信息
SALTSTONE 1QCY10 TCLP RESULTS
Reigel, M.
关键词: ANTIMONY;    ARSENIC;    BARIUM;    BENZENE;    BERYLLIUM;    CADMIUM;    CHROMIUM;    GROUTING;    MERCURY;    NICKEL;    PHENOLS;    REGULATIONS;    SANITARY LANDFILLS;    SELENIUM;    SILVER;    SOLID WASTES;    SOLVENT EXTRACTION;    TANKS;    THALLIUM;    WASTE MANAGEMENT;    WASTES;   
DOI  :  10.2172/983873
RP-ID  :  SRNL-STI-2010-00267
PID  :  OSTI ID: 983873
Others  :  TRN: US201015%%1013
学科分类:材料科学(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the first quarter of the 2010 calendar year (1QCY10), Tank 50H accepted transfers of approximately 32 kgal from the Effluent Treatment Project (ETP), approximately 10 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 32 kgal from the H-Canyon Super Kukla campaign, and approximately 26 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT). The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from samples of Tank 50H obtained January 8, 2010 during 1QCY10 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&W TSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&W TSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.
【 预 览 】
附件列表
Files Size Format View
RO201704240002018LZ 231KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:37次