科技报告详细信息
Scale-Up of World Record 16.5% CdTe Cell Design for a 50 MWp Production Facility: September 27, 2007 - March 26, 2009
Seymour, F. H.
关键词: CADMIUM TELLURIDES;    COMMERCIALIZATION;    COMMISSIONING;    DESIGN;    EFFICIENCY;    MANUFACTURING;    PARITY;    PERFORMANCE;    PRODUCTION SOLAR CELLS;    CDTE;    PV;    SAI;    Solar Energy - Photovoltaics;   
DOI  :  10.2172/1013903
RP-ID  :  NREL/SR-5200-51518
PID  :  OSTI ID: 1013903
Others  :  Other: NAT-7-77015-07
Others  :  TRN: US201111%%149
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This final report covers progress made on subcontract NAT-7-77015-07 by PrimeStar Solar Inc. for the 18 month period from September 27, 2007 through March 26, 2009. The project objectives were to accelerate the commercialization of the world record 16.5% efficiency cadmium telluride photovoltaic technology. This was done by developing high performance 6"x6" prototype mini-modules and by designing and commissioning a pilot line for manufacturing of commercial sized 60cmx120cm modules. This subcontract aligns with the SAI program by accelerating the development of high efficiency low cost CdTe solar PV module manufacturing. This will contribute to the goal of PV grid parity by 2015. Progress with the deliverables and milestones in this subcontract constitutes progress towards the KPP and milestone objectives for the SAI program.

【 预 览 】
附件列表
Files Size Format View
RO201704210002350LZ 559KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:23次