EVALUATION OF SUPPLEMENTAL PRE-TREATMENT DEVELOPMENT REQUIREMENTS TO MEET TRL 6 ROTARY MICROFILTRATION | |
HUBER HJ | |
关键词: AR FACILITIES; COMPLIANCE; CONFIGURATION; DESIGN; DOLLARS; EVALUATION; FILTRATION; FORMALDEHYDE; ION EXCHANGE; MANUFACTURING; RESORCINOL; TESTING; WASTES; | |
DOI : 10.2172/1033112 RP-ID : RPP-RPT-50832 Rev 0 PID : OSTI ID: 1033112 Others : TRN: US1200286 |
|
学科分类:核能源与工程 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
In spring 2011, the Technology Maturation Plan (TMP) for the Supplemental Treatment Project (RPP-PLAN-49827, Rev. 0), Technology Maturation Plan for the Treatment Project (T4S01) was developed. This plan contains all identified actions required to reach technical maturity for a field-deployable waste feed pretreatment system. The supplemental pretreatment system has a filtration and a Cs-removal component. Subsequent to issuance of the TMP, rotary microfiltration (RMF) has been identified as the prime filtration technology for this application. The prime Cs-removal technology is small column ion exchange (ScIX) using spherical resorcinol formaldehyde (sRF) as the exchange resin. During fiscal year 2011 (FY2011) some of the tasks identified in the TMP have been completed. As of September 2011, the conceptual design package has been submitted to DOE as part of the critical decision (CD-1) process. This document describes the remaining tasks identified in the TMP to reach technical maturity and evaluates the validity of the proposed tests to fill the gaps as previously identified in the TMP. The potential vulnerabilities are presented and the completed list of criteria for the DOE guide DOE G 413.3-4 different technology readiness levels are added in an attachment. This evaluation has been conducted from a technology development perspective - all programmatic and manufacturing aspects were excluded from this exercise. Compliance with the DOE G 413.3-4 programmatic and manufacturing requirements will be addressed directly by the Treatment Project during the course of engineering design. The results of this evaluation show that completion of the proposed development tasks in the TMP are sufficient to reach TRL 6 from a technological point of view. The tasks involve actual waste tests using the current baseline configuration (2nd generation disks, 40 psi differential pressure, 30 C feed temperature) and three different simulants - the PEP, an AP-Farm and an S-saltcake. Based on FY2011 dollars used in the TMP, these tests will have ROM costs of $950K and require up to 10 months to complete. Completion of the simulant testing will satisfy the TRL 5 and TRL 6 criteria that are related to system testing with materials that represent the full range of properties in a relevant environment.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704210000721LZ | 702KB | download |